Crojfe

Search

A Three-Step Neural Network Artificial Intelligence Modeling Approach for Time, Productivity and Costs Prediction: A Case Study in Italian Forestry

Copyright © 2017 by Croatian Journal of Forest Engineering
doi: https://doi.org/10.5552/crojfe.2020.611
volume: 41, issue: 1
pp: 15
Author(s):
  • Proto Andrea Rosario
  • Sperandio Giulio
  • Costa Corrado
  • Maesano Mauro
  • Antonucci Francesca
  • Macrì Giorgio
  • Scarascia Mugnozza Giuseppe
  • Zimbalatti Giuseppe
Article category:
Original scientific paper
Keywords:
ANN, AI, mechanization, accuracy, multivariate statistics, harvesting

Abstract

HTML

PDF

The improvement of harvesting methodologies plays an important role in the optimization of wood production in a context of sustainable forest management. Different harvesting methods can be applied according to forest site-specific condition and the appropriate mechanization level depends on a number of factors. Therefore, efficiency and functionality of wood harvesting operations depend on several factors. The aim of this study is to analyze how the different harvesting processes affect operational costs and labor productivity in typical small-scale Italian harvesting companies. A multiple linear regression model (MLR) and artificial neural network (ANN) have been carried out to predict gross time, productivity and costs estimation in a series of qualitative and quantitative variables. The results have created a correct statistical model able to accurately estimate the technical parameters (work time and productivity) and economic parameters (costs per unit of product and per hectare) useful to the forestry entrepreneur to predict the results of the work in advance, considering only the values detectable of some characteristic elements of the worksite.

A Three-Step Neural Network Artificial Intelligence Modeling Approach for Time, Productivity and Costs Prediction: A Case Study in Italian Forestry

Andrea Rosario Proto, Giulio Sperandio, Corrado Costa, Mauro Maesano, Francesca Antonucci, Giorgio Macrì, Giuseppe Scarascia Mugnozza, Giuseppe Zimbalatti

Abstract

The improvement of harvesting methodologies plays an important role in the optimization of wood production in a context of sustainable forest management. Different harvesting methods can be applied according to forest site-specific condition and the appropriate mechanization level depends on a number of factors. Therefore, efficiency and functionality of wood harvesting operations depend on several factors. The aim of this study is to analyze how the different harvesting processes affect operational costs and labor productivity in typical small-scale Italian harvesting companies. A multiple linear regression model (MLR) and artificial neural network (ANN) have been carried out to predict gross time, productivity and costs estimation in a series of qualitative and quantitative variables. The results have created a correct statistical model able to accurately estimate the technical parameters (work time and productivity) and economic parameters (costs per unit of product and per hectare) useful to the forestry entrepreneur to predict the results of the work in advance, considering only the values detectable of some characteristic elements of the worksite.

Keywords: ANN, AI, mechanization, accuracy, multivariate statistics, harvesting

 

1. Introduction

Forests and timber represent a vital contributor to rural areas from the economic, environmental and social viewpoint and wood harvesting is one of the most important management activities both to meet production objectives and shape the composition of the future forest (FAO 1997). This active management can be done through several techniques to guarantee the correct implementation of forestry operations, to increase operators’ productivity and efficiency and to improve workers qualifications and occupational safety. Worldwide, the improvement of harvesting methodologies plays an important role in the optimization of wood production in a context of sustainable forest management (Maesano et al. 2013). Different harvesting methods are applied according to forest site-specific condition and degree of mechanization. The appropriate mechanization level depends on several factors. In Italy, wherever terrain characteristics are suitable, the forest managers have replaced the chainsaw to alternative highly mechanized systems, especially for the harvesting of specialized forest plantation such as poplar (Spinelli and Magagnotti 2011) and eucalyptus (Picchio et al. 2012), but in mountainous areas, where numerous restrictions related to environmental protection are imposed, the conventional and traditional mechanization is applied (Baraldi and Cavalli 2008, Zimbalatti and Proto 2009). The three main wood harvesting methods are: full-tree (FT), tree-length (TL), and cut-to-length (CTL). Anyway, the choice of a harvesting method depends on the final product required and can be divided into the following groups, sorted to relevance and level of diffusion:

Þ motor-manual FT/TL harvesting: felling and processing with a chainsaw, and skidding with a farm tractor and winch or grapple

Þ motor-manual CTL harvesting: felling and processing with a chainsaw, and skidding with a farm tractor and bin or trailer

Þ partially mechanized FT/TL harvesting: felling and processing with a chainsaw, and skidding with a skidder or cable crane

Þ partially mechanized CTL harvesting: felling and processing with a chainsaw, and skidding with a forwarder

Þ fully mechanized CTL harvesting: felling and processing with a harvester and skidding with a forwarder

Þ fully mechanized FT harvesting: felling with a feller-buncher, extraction with a skidder, and processing with a processor.

In general, motor-manual operations are frequently applied in steep terrain and the farm tractor equipped with forestry winches, grapples, trailers or bins is the most widely used means of timber extraction. Skidders, cable cranes and forwarders are used where farm tractors are limited by terrain steepness and roughness and to guarantee more productivity and safety with respect to traditional extraction methods.

Consequently, each harvesting system has its specific features that depend on natural and production conditions, the technology used, and the role of manual operations in the overall process (Gerasimov and Sokolov 2014, Apăfăian et al. 2017). Therefore, efficiency and functionality of wood harvesting operations depend on several factors (Proto et al. 2017). For this reason, the forest scientific community aimed to produce empirical models or to comparatively assess the performance of two or more operational alternatives to predict the performance of operational behavior (Musat et al. 2016). One of the common ways to evaluate the harvesting systems productivity is to measure working time for every single phase and to evaluate cost-production (Picchio et al. 2009, Bîrda and Borz 2012). The determination of these factors for each phase (felling, bunching, skidding, loading, etc.) can define corresponding time models and help forest managers to choose the best method of extracting wood, and efficiently manage the process of harvesting activity (Ghaffariyan et al. 2012). The forest operations productivity studies are considerable and have a long tradition. Anson (1953) associated the effect of independent variables on time consumption and Steinlin (1955) recommended to measure the time consumed and the quantity produced for carrying out a statistical evaluation to relate the two quantities. Harstela (1988) showed that time studies offer different resolution depending on the level of detail in which they describe the studied process, while Bergstrand (1991) suggested to separate functional elements that react to different work characteristics for developing accurate sub-models. Kanawaty (1992) identified the basic techniques of work study including optimization of planning processes and implementation of standards for machine utilization. Mundel and Danner (1994) defined time study as a set of procedures for determining the amount of time required, under certain standard conditions of measurement, for tasks involving some human, machine, or combined activity. Björheden et al. (1995) normalized the time study procedures adapting to the specificity of forest work processes to allow the direct measurement of time expenditure on work elements. In the last decade, several studies (Costa et al. 2012, Spinelli et al. 2013, Costa et al. 2014, Naghdi et al. 2016) have addressed the application and/or extrapolation of time studies results for determining appropriate harvesting rates, the accuracy of measurements, the time study techniques to develop new mathematical models. Therefore, these studies have expanded to determining the influence of the operating environment, the operational efficiency and the integration of harvesting with operator skills, and the dynamics of human-machine systems.

Artificial intelligence (AI) multivariate methods based on artificial neural networks (ANNs) are well-known computational systems to predict the output of complex systems and solve multifaceted nonlinear problems (even without prior information with high accuracy (Nabavi-Pelesaraei et al. 2018). Generally, ANN is an alternative to traditional methods of modeling (e.g., the statistical regression models) and has greater generalizability, less susceptibility to noise and outliers, and the ability to model nonlinear relations compared to regression models (Haykin 2009). These characteristics are important in modeling the growth and yield of forest stands. In addition, when variables are many and include both quantitative and qualitative ones, the most effective approaches resulted to be non-linear (Assirelli et al. 2018). There are still few examples of AI approaches in forestry (Bui et al. 2017, Reis et al. 2018). For example, in the study of Sanquetta et al. (2018) different AI models (i.e., k-nearest neighbors (KNN) and ANN) were tested to estimate merchantable volumes of Japanese cedar (Cryptomeria japonica) trees in a homogenous plantation in southern Brazil. These models with respect to traditional ones tended to give lower bias, better precision and accuracy in the middle portion of the stems. Moreover, Vieira et al. (2018) used two AImodels (i.e., ANN and adaptive neuro-fuzzy inference system) to estimate the growth in diameter and total height of eucalyptus trees.

The purpose of this study is to analyze how the different harvesting processes affect operational costs and labor productivity in typical small-scale Italian harvesting companies. A comparative study of conventional and innovative logging operations, under as uniform conditions as possible, has been conducted for supporting decision-making when selecting relevant technology and machinery in harvesting activities. A traditional linear (Multiple Linear Regression; MLR) and an artificial intelligence neural network (ANN) non-linear approach have been adopted on a database composed by a series of qualitative and quantitative variables to predict gross time, productivity and costs.

 

2. Materials and Methods

2.1 Study Sites and Harvesting Methods

The research was carried out in three experimental sites in Southern Italy (Calabria Region), in Fabrizia (Site A), Cardinale (Site B) and Brognaturo (Site C) municipalities (Fig. 1). The study area covered a total area of 47 hectares (10, 12 and 25 ha in site A, B and C, respectively) with an altitude ranging from 980 to 1150 m. The main characteristics of the study sites are shown in Table 1.

Fig. 1 Three study sites in Southern Italy (Calabria Region)

Three different processes of wood harvesting were adopted using the TL systems and the FT systems. In total, five test worksites were monitored (1A, 1B, 2A, 3A and 3B) and different harvesting methods were applied (Table 2).

Table 1 Main characteristics of five test worksites

Characteristics

Site

1A

Site

1B

Site

2A

Site

3A

Site

3B

Municipality

Fabrizia

(VV)

Cardinale

(CZ)

Brognaturo

(VV)

Prevalent Specie

Chestnut

Chestnut

Calabrian

Pine

Beech

Silver

fir

Government

Coppice

Coppice

High

forest

High

forest

High

forest

Altitude, m a.s.l.

1050

980

1110

1090

1150

Stand density, plants/ha

600

600

750

500

550

Total volume, m³/ha

470

500

700

575

700

Average DBH, cm

16

15

24.5

29

30

Average height, m

14.5

14

25

23.5

27.4

Average tree volume, m³

0.10

0.13

0.42

0.6

0.57

Slope Min, %

48

61

40

25

17

Slope Max, %

68

73

80

71

64

Slope medium, %

58

67

27

55

42

Roughness

Medium

High

Medium

High

Medium

Total volume extracted

2350

2250

1680

1437

1375

Volume per ha, m³/ha

470

500

140

115

110

In the first study area, located in the municipality of Fabrizia (Province of Vibo Valentia), the TL system was adopted and two different coppice chestnut forest stands (Castanea sativa Mill.) were monitored and marked with letters 1A and 1B. In site 1A (38°28’24” N – 16°16’30” E), a Stihl MS 261C-M (2.9 kW) chainsaw was used for felling and delimbing. The felling team consisted of two chainsaw operators and a farm tractor, (Landini Landpower 165 TDI, 121.6 kW), equipped with forest winch used for skidding, worked in moderately rough terrain (UK Forestry Commission 1995). In site 1B (38°27’29”N – 16°16’01”E), classified as roughness class III and with slopes greater than 60 percent, the same team worked in felling while the bunching phase was realized using a Greifenberg TG700 (84 kW) cable crane. The same farm tractor equipped with a grapple was used for extracting trees.

In the second study area (2A: 38°36’59” N – 16°23’34” E), located in the municipality of Cardinale (Province of Catanzaro), the FT system was adopted and selective felling was applied in a Calabrian Pine (Pinus nigra Arn. ssp. laricioPoiret var. Calabrica Delamare) forest. Tree felling team was composed of two operators and the working phase was performed by chainsaw (Husqvarna 560 XP, 3.5 kW), whereas a John Deere grapple skidder was used for skidding operations involving a single operator. The forest was classified as roughness class II, while the slope varied between class IV and V.

In the third study area, located in the municipality of Brognaturo (Province of Vibo Valentia), two high forests of different age were studied, beech (Fagus sylvatica L.) and silver fir forest (Abies alba Mill.); the sites were monitored and marked with letters 3A and 3B. In this site (38°34’51” N – 16°22’17” E), after the felling, the trees were delimbed by a team of two workers equipped with two chainsaws (Husqvarna 560 XP, 3.5 kW) and extracted by a farm tractor with forest winch. In the second site (3B: 38°32’47” N – 16°21’22” E), the felling phase was the same as that in 3A, while a John Deere grapple skidder was used for skidding operations. In the beech stand, the terrain conditions were difficult with respect to the silver fir forest with higher inclination and roughness. With respect to other two sites (1A and 1B), in the sites 2A, 3A and 3B, the delimbing phase was assisted by a mini-excavator (32 kW) for moving the logs and the work time of this machine was assessed with a flat rate of 30 % of the gross time required for tree bunching.

Table 2 Description of the experimental design of the five test work sites

Site

Harvesting

Method

Felling

Delimbing

Bunching

Extraction

1A

TL

Chainsaw 1

Farm tractor + winch

1B

TL

Chainsaw 1

Cable

crane

Farm tractor

+

grapple

2A

FT

Chainsaw 2

(Mini-excavator)

Forest

loader

Skidder

+

grapple

3A

TL

Chainsaw 2

(Mini-excavator)

Farm tractor

+

winch

3B

FT

Chainsaw 2

(Mini-excavator)

Forest

loader

Skidder

+

grapple

2.2 Time Study

The time study data were collected during the spring of 2016 and the autumn of 2017. The times of the different work phases were measured separately using the repetition-timing method to determine the total yarding cycle time. Each work cycle was divided into work elements and classified as productive time or delay time, following the terminology »Forest Work Study Nomenclature« suggested by a subcommittee of IUFRO Working Party $3.04.02 (Work study; Payment, Labour productivity) (Björheden et al. 1995) and approved by the IUFRO Division 3 and timed using a digital chronometer (i.e., 1 min = 100 unit), Tag-HeuerMicrosplit™. Particularly, regarding the extraction cycle using a farm tractor and skidder, the productive time was subdivided into six elements:

Þ travel unloaded (similar for winch and grapple): begins when the skidder/farm tractor leaves the landing area and ends when the skidder stops in the stump area

Þ release and hooking (farm tractor+winch): begins when the worker has just grabbed the cable and sets the choker on the tree about 0.5–1.0 m away from the tree end, and ends when the operator starts winching

Þ winching (farm tractor+winch): begins when the driver starts to winch and ends when the tree has arrived at the rear part of the farm tractor

Þ grabbing (skidder/farm tractor+grapple): begins when the grapple opens and takes the trees and ends when the grapple is closed

Þ travel loaded (similar for winch and grapple): begins when the machine moves to the landing and ends when it reaches the landing

Þ unhooking (similar for winch and grapple): begins when the machine reaches the landing and ends when the load is unhooked.

Concerning the cable crane, seven yarding phases were monitored (Proto et al. 2016):

Þ outhaul empty: begins when the operator is ready to move carriage from landing out to choke setter and ends when the choke setter touches the choke

Þ hook descent: begins when the operator locks the carriage and begins to release the hook, and it ends when the operator starts to connect with the load

Þ lateral out: begins at the end of outhaul empty and ends when the choke setter is ready to hook a turn (choke setter's forward motion has stopped and is ready to begin setting the chokers)

Þ hookup: begins at the end of lateral out and ends when the choke setter has completed hooking the chokers and signals to begin yarding

Þ lateral in: begins at the end of hookup and ends when the turn is pulled up to the carriage and the carriage begins to move up the corridor

Þ in haul: begins at the end of lateral in and ends when the turn has reached the position on the deck where it can be directly unhooked at the landing

Þ unhook: begins at the end of in haul when the carriage passes over the tripblock and ends when the chokers have returned to the carriage.

2.3 Economic Evaluations

To calculate the hourly cost of wood harvesting in the different study sites, many parameters were considered (Olsen and Kellogg 1983) and the Miyata (1980) method was applied. To calculate the production cost for 1 m3 of wood, the cost analysis employed the following parameters: the number of operators, the hourly cost of an operator, the hourly cost of machines, the volume of wood extracted and productive machine hours excluding all delay times. The purchase prices and operator wages required by the cost calculations were obtained from catalogues and accounting records. Cost calculations were based on the assumptions adopted in recent economic studies (Magagnotti and Spinelli 2011, Spinelli and Magagnotti 2011, Proto and Zimbalatti 2016, Proto et al. 2018). In the machine cost calculation, the relocation costs have not been considered.The principal technical and economical parameters and the machine cost are shown in Table 3.

Table 3 Assumed cost parameters and calculated hourly machine costs

Description

Felling/Delimbing

Bunching/Extraction

Chainsaw 1

Chainsaw 2

Mini–excavator

Farm Tractor with

winch/grapple

Cable Crane

Skidder with

grapple

Forest loader

Purchase price, €

1100

940

50,000

79,000

150,000

200,000

80,000

Initial investment (no tires cost)

1100

940

48,500

76,200

149,400

197,000

78,200

Salvage value, €

220

188

10

15,240

29,880

39,400

15,640

Economic life, years

3

3

10

10

10

10

10

Productive machine hours, h/year

700

700

800

1,000

800

740

800

Engine power, kW

3.5

2.9

32

121

84

110

88

Interest rate, %

4

4

4

4

4

4

4

Fuel consumption, L/h

1.32

1.09

2.79

17.58

12.50

15.00

10.23

Lubricant consumption, L/h

0.59

0.49

0.30

0.54

0.40

0.38

0.45

Fuel price, €/L

1.55

1.55

1.05

1.05

1.05

1.05

1.05

Lubricant price, €/L

4.5

4.5

9

9

9

9

9

Tires cost, €

1500

2800

600

3000

1800

Qualified labor cost (ancillary wage included), €/h

15

15

15

15

15

15

Specialized labor cost (ancillary wage included), €/h

21

21

Hourly machine cost, €/h

5.50

4.58

24.45

37.95

51.35

68.95

33.25

2.4 Modeling Approaches

The statistical analyses were performed on the matrix composed of 6 quantitative and 4 qualitative (i.e., categorical) variables per 252 cycles (i.e., observations). Six quantitative variables are: average slope, average DBH, wood biomass per hectare (m3 ha-1), bunching distance (m), extraction distance (m) and load per cycle (m3 cycle-1). The four qualitive variables, expressed as dummy variables are: governance (management of coppice or high forest), machine used for log extraction (tractor with winch, cable crane, skidder with grapple), working system (TL or FT) and roughness (medium or high), classified in relation to the presence of obstacles on the ground (outcropping rocks, stone, etc.) in accordance with UK Forestry Commission (1995).

A three-step approach was applied (Guerrieri et al. 2016). In the first step, the gross time (minutes per transported load) was estimated based on the above ten variable matrix. In the second step, the gross productivity (m3 h-1 per operator) was estimated based on ten variable matrix together with the gross time estimated (11 variables). In the third step, the cost per m3 (€ m3) and cost per hectare (€ ha-1) was estimated based on ten variable matrix together with the estimated gross time and productivity (12 variables).

The model for gross time, productivity and costs estimation was developed using a non-linear regressive ANN approach compared with a MLR model. As the database is composed of a series of qualitative and quantitative variables, the best way to find a regressive solution is a non-linear approach. ANN was developed based on the input layer (x-block) to estimate the output layer (y-block). Between the input and output layers, one or more hidden layers were built by the ANN procedure based on its architecture. The number of hidden layers used was equal to 3 nodes. The type and the complexity of the process or experimentation usually iteratively determine the optimal number of the neurons in the hidden layers (Gupta 2013).

The ANN model was developed using a Multi-Layer Feed Forward Networks (MLFN) structure, the method often used for function approximation (Mossalam and Arafa 2017). The ANNs models are massively parallel systems with large numbers of interconnected simple processors. These networks are fine-grained parallel implementations of non-linear static or dynamic systems (Hassoun 1995). The general regression neural network (GRNN) was trained with a back-propagation learning algorithm. Out of 252 observations, only 227 samples (90 %) were used to construct the models to avoid overfitting. The remaining 25 samples (10 %) were then used to test the performance of the models (internal test). The partitioning was conducted using the sample set partitioning based on joint x-y distances (SPXY) algorithm (Harrop Galvao et al. 2005) that considers the variability in both X- and Y-spaces. The training of the ANN was carried out using a learning equal to 0.5 and a momentum equal to 0.1. The training procedure was repeated 1,000,000 times and the best performing MLFN was selected based on the independent test set. The final architecture of the ANN includes a different number of nodes in the hidden layer depending of the kind of variable to be estimated. Performance parameters, such as the r correlation coefficient between the observed and predicted and the Root Mean Squared Error (RMSE), were reported for both training and test sets. A variable impact neural network analysis was performed to assess the relative importance of each variable (Abdou et al. 2012). Operatively, this index is similar to the linear regression Variable Importance in the Projection (VIP) scores (Chong and Jun 2005, Febbi et al. 2015). The ANN analysis has been performed using Palisade Neural Tools 7.6.

The ANN model performance (r correlation coefficient and RMSE) on the same datasets has been compared with a MLR model applied on the same partitioned datasets. Ordinary linear regression approaches, such as MLR, are widely used in the agricultural and forestry frameworks for the estimation of quantitative parameters (Costa et al. 2012). MLR is the most common form of linear regression analysis, generally used to explain the relationship between one dependent variable (y-block) and two or more independent variables (x-block).

 

3. Results and Discussion

In the three study sites, 252 cycles and more than 250 h of operations were analyzed and evaluated. The total productivity (m3/PMH) in worksite 1 (1A+1B) was 0.85 and 0.74, in worksite 2A it was 1.6 and in worksite 3 (3A+3B) it was 1.5 and 1.70, respectively. Data regarding the total travel distance for the cycles, number of logs and total volume are shown in Table 4.

Table 4 Elements related to bunching and extraction operations

Worksite

Bunching distance

m

Extraction distance

m

Logs

N/load

Load

m3/cycle

1A

21.15

350.84

3.63

0.57

1B

26.54

200.25

4.06

0.58

2A

366.10

4.54

1.74

3A

41.64

391.00

1.80

1.16

3B

236.00

4.61

2.39

Mean and standard positive deviation values of the gross time, gross productivity and costs (per m3 and hectare) for each worksite were visually reported by histograms. Figs. 2 and 3 show the operating results referred to the total gross times and productivity, for all operations concerning the forest work performed. Figs. 4 and 5 show the economic results of the five sites relative to the evaluation of the costs per unit of product and per unit of surface, in relation to the extraction systems adopted.

Fig. 2 Mean (+SD; whiskers) gross time of logging in five sites, divided into different operations

Regarding the felling phase, although the same team and systems were used, a different productivity (m3 h-1 per worker) was observed (1.55, 1.47, 2.58, 3.34 and 3.38 in site 1A, Site 1B, Site 2A, Site 3A, and Site 3B respectively). This was due to the different tree sizes with higher unit volumes for the sites 2A (0.38 m3), 2B (0.64 m3) and 3B (0.54 m3), compared to sites 1A (0.16 m3) and 1B (0.14 m3). The average bunching distances were 21, 27 and 42 m in site 1A, Site 1B, Site 3A, respectively, while this phase was not adopted in site 2A and Site 3B. The bunching productivity varied significantly at different sites monitored. The extraction distances varied form the minimum of 200 m in site 1B and the maximum of 391 m in site 3A. The unit complete productivity (m3 h-1 per worker) was 0.42, 0.37, 0.99, 0.75 and 1.12 in site 1A, Site 1B, Site 2A, Site 3A, and Site 3B, respectively. Costs per unit of product (€ m-3) were lower in sites 3B (38.56) and 3A (41.45), due the lowest cost for wood extraction of the skidder use, while the costs were much higher in sites 1A (65.19) and 1B (86.27), where the cost of extraction was very high. The worst result was obtained in site 1B with the use of the cable crane, in a terrain with high slope. The costs per hectare reach the maximum value in site 1B with € 43,137 and the lowest cost in site 3B with € 4241. The lower logging costs per hectare, obtained in sites 3B, 2A and 3A, as well as higher work productivity, are to be correlated to the different volume of extracted wood, which at these sites was considerably lower (110, 140 and 115 m3 ha-1, respectively), compared to sites 1A and 1B (470 and 500, respectively).

Fig. 3 Mean (+SD; whiskers) gross productivity of logging in five sites, divided into different operations

Fig. 4 Mean (+SD; whiskers) cost per m3 of logging in five sites, divided into different operations

Fig. 5 Mean (+SD; whiskers) cost per hectare of logging in five sites, divided into different operations

Table 5 shows the results of the MLR and ANN models for both training and internal test, for the estimation of gross time, gross productivity and cost. Comparing the two methods, it is possible to observe definitely higher performances (up to 10 % higher) of the ANN approach for both modeling and test sets to estimate gross time, cost per m3 and cost per hectare, while results are comparable for gross productivity estimation. MLR test set correlation coefficient (r) results ranged from 0.86 (gross time) to 0.98 (gross productivity) estimation. ANN test set correlation coefficient (r) results ranged from 0.96 (gross time) to 0.99 (cost per hectare) estimation.

Fig. 6 shows the scatter plots of the observed versus predicted estimation of gross time, gross productivity, cost per m3 and cost per hectare in both MLR and ANN. In both MLR and ANN modeling approaches, the prediction of gross productivity resulted visually linear. ANN models predicted vs observed scores resulted closer to the bisectrix (i.e. perfect attribution).

Fig. 6 clearly shows the superiority of estimation with ANN method with respect to MLR method. This difference is even more accentuated in the estimation of the cost per hectare, where the deviation of the predicted value from the observed value calculated with MLR is higher. The difference between the worksites is also more evident with significantly lower costs per hectare for the worksites 2A, 3A and 3B, managed to high forest, with respect to the worksite 1A and 1B, managed to coppice.

Table 5 Characteristics and principal results of MLR and ANN models (training and internal test) in estimating gross time, gross productivity, cost per m3 and cost per hectare: number of cases, training time, number of trials, r correlation coefficient, Root Mean Square Error (RMSE)

 

MLR

ANN

Gross time

Gross productivity

Cost per m3

Cost per ha

Gross time

Gross productivity

Cost per m3

Cost per ha

Training (90 % sample size)

Training (90 % sample size)

Number of cases

227

227

Training time

Not available

00:06:01

00:05:12

00:05:02

00:05:52

Number of trials

Not available

1,000,000

1,000,000

1,000,000

1,000,000

Number of nodes

Not available

4

3

3

3

r correlation coefficient

0.945

0.983

0.942

0.973

0.979

0.983

0.986

0.996

Root Mean Square Error (RMSE)

7.495

0.059

7.436

3999.245

4.713

0.046

3.672

1576.23

 

Testing (10 % sample size)

Testing (10 % sample size)

Number of cases

25

25

r correlation coefficient

0.863

0.983

0.875

0.922

0.962

0.984

0.966

0.992

Root Mean Square Error (RMSE)

12.847

0.071

11.141

6614.403

7.495

0.077

5.995

2237.59

Fig. 6 Scatter plot of the observed versus predicted gross time, gross productivity, cost per m3 and cost per hectare obtained from the MLR (left side) and ANN models (right side). Lines represent the bisectrices (i.e. perfect attribution)

Table 6 reports the percentage of VIP scores of the ANN models for the estimation of gross time, gross productivity, cost per m3 and cost per hectare. In the prediction of the gross time, the variable »load per cycle« has the most important impact (20.22 %). For the estimation of the gross productivity, it is the »wood biomass per hectare« with a percentage of 18.49 % and finally for the Cost per m3 and per ha, these are »gross time prediction« (13.78 %) and »average DBH« (21.60 %).

Table 6 Percentage of Variable Importance in the Projection (VIP) scores of ANN models in estimating gross time, gross productivity, cost per m3 and cost per hectare

  

Gross time

%

Gross

productivity, %

Cost per

m3, %

Cost per

ha, %

Quantitative variables

Average slope

17.07

12.88

10.90

10.56

Average DBH

15.62

12.54

9.22

21.60

Wood biomass

per hectare

8.96

18.49

7.14

3.44

Bunching distance

6.24

1.13

1.41

7.63

Extraction distance

6.93

0.39

2.00

6.22

Load per cycle

20.22

4.26

12.35

6.40

Gross time pred.

10.08

13.78

6.36

Gross productivity

pred.

11.79

18.80

Qualitative variables

Government

5.75

10.63

10.36

2.47

Machine used

for log extraction

12.29

15.01

4.92

9.37

Working system

3.56

7.11

9.24

5.04

Roughness

3.35

7.48

6.89

2.12

The obtained MLR and ANN models were based on heterogeneous input dataset, constituted by quantitative (DBH in cm, biomass in m3, distance in m, time in min, productivity in m3 h-1, costs in €) and qualitative variables (governance, working system and roughness). These models proved to be extremely efficient as well as generalizable and robust, but the ANN model has a higher predictive capacity and accuracy than the MLR. The ANN model adopted is highly able to accurately estimate the technical parameters and economic parameters useful to the forestry entrepreneur to predict the results of the work in advance, taking into account only the detectable values of some characteristic elements of the worksite.

 

4. Conclusions

The wood harvesting is composed of several consecutive operations over time, such as the felling of trees, delimbing, wood extraction, loading and transport. This process can be represented by empirical models to meet different objectives, such as the planning of forest wood chain, the calculation of the cost of harvesting and the convenience to adopt different working systems and degrees of mechanization. For this reason, the interest in exploring alternatives to ordinary linear regression, such as ANN predictive modeling is constantly growing. In this study, the authors compared the MLR and ANN analysis allowing to produce models that, in addition to better adapting to the original data, can also manage collinear variables, facilitating the extraction of models from large amounts of field data and different forest operations.

The system was successfully used in the field tests and provided accurate and satisfactory data observing higher performances of the ANN approach than the MLR. Although ANN models are somewhat less practical than standard regression equations, they are certainly more robust in terms of variable oscillations and higher repeatability and are particularly suitable, unlike linear models, for modeling systems with greater complexity and more difficult to manage.

The comparison of the various modeling approaches indicated that the generated models could predict work time, productivity and costs per unit of product and per hectare. The statistical models developed through numerous and different harvesting systems tested in this study could be used for harvesting planning and productivity optimization. Considering the recent dynamic growth in mechanized forest operations (Spinelli et al. 2017, Mederski et al. 2018), it is fundamental to select the correct wood harvesting method, and this study enables taking into consideration all qualitative and quantitative variables to obtain a valid and accurate prediction.

Acknowledgments

This study is a part of the Project »ALForLab« (PON03PE_00024_1) co-funded by the National Operational Programme for Research and Competitiveness (PON R&C) 2007-2013, through the European Regional Development Fund (ERDF) and national resource (Revolving Fund-Cohesion Action Plan (CAP) MIUR). Some activities in this study were funded by the project AGROENER (D.D. n. 26329) funded by the Italian Minstry of Agriculture (MiPAAF).

 

5. References

Abdou, H.A., Kuzmic, A., Pointon, J., Lister, R.J., 2012: Determinants of capital structure in the UK retail industry: A comparison of multiple regression and generalized regression neural network. Intelligent Systems in Accounting, Finance and Management 19(3): 151–169. https://doi.org/10.1002/isaf.1330

Anson, C.J., 1953: The development of time study. Work Study 2(12): 19–25. https://doi.org/10.1108/eb060120

Apăfăian, A.I., Proto, A.R., Borz, S.A., 2017: Performance of a mid-sized harvester-forwarder system in integrated harvesting of sawmill, pulpwood and firewood. Ann. For. Res. 60 (2): 227–241. https://doi.org/10.15287/afr.2017.909

Assirelli, A., Caracciolo, G., Cacchi, M., Sirri, S., Pallottino, F., Costa, C., 2018: Evaluation of the detachment force needed for mechanical thinning of green peach fruits. Sustainability 10(7): 2291. https://doi.org/10.3390/su10072291

Baraldi, G., Cavalli, R., 2008: Innovations in the field of mechanical technologies for quality agricultural and forest products. Ital. J. Agron. 3(1): 155–160. https://doi.org/10.4081/ija.2008.1s.155

Bergstrand, K.G., 1991: Planning and analysis of forestry operation studies. Skogsarbeten Bulletin 17, Uppsala, Sweden, 17 p.

Bîrda, M., Borz, S.A., 2012: A comparison between tractor based and skyline based mechanized systems for timber logging. Bulletin of the Transilvania University of Brasov, Series II 5(1): 19–24.

Björheden, R., Apel, K., Shiba, M., Thompson, M.A., 1995: IUFRO Forest Work Study Nomenclature. Test Edition, SLU, Swedish University of Agricultural Sciences, Department of Operational Efficiency, Garpenberg, Sweden, 16 p.

Bui, D.T., Bui, Q.T., Nguyen, Q.P., Pradhan, B., Nampak, H., Trinh, P.T., 2017: A hybrid artificial intelligence approach using GIS-based neural-fuzzy inference system and particle swarm optimization for forest fire susceptibility modeling at a tropical area. Agricultural and forest meteorology 233: 32–44. https://doi.org/10.1016/j.agrformet.2016.11.002

Chong, I.G., Jun, C.H., 2005: Performance of some variable selection methods when multicollinearity is present. Chemometrics and Intelligent Laboratory Systems 78(1–2): 103–112. https://doi.org/10.1016/j.chemolab.2004.12.011

Costa, C., Menesatti, P., Spinelli, R., 2012: Performance modelling in forest operations through partial least square regression. Silva Fennica 46(2): 241–252.

Costa, C., Sperandio, G., Verani, S., 2014: Use of multivariate approaches in biomass energy plantation harvesting: logistic advantages. Agric. Eng. Int. CIGR J., Special issue 2014: 70–79.

Febbi P., Menesatti P., Costa C., Pari L., Cecchini M., 2015: Automated determination of poplar chip size distribution based on combined image and multivariate analyses. Biomass & Bioenergy 73: 1–10. https://doi.org/10.1016/j.biombioe.2014.12.001

Food and Agriculture Organization of the United Nations (FAO), 1997. State of the World's Forests, 1997. Rome, Italy, 302 p. http://www.fao.org/3/a-w4345e.pdf

Gerasimov, Y., Sokolov, A., 2014: Ergonomic evaluation and comparison of wood harvesting systems in Northwest Russia. Appl. Ergon. 45(2): 318–338. https://doi.org/10.1016/j.apergo.2013.04.018

Ghaffariyan, M.R., Naghdi, R., Ghajar, I., Nikooy, M., 2012: Time prediction models and cost evaluation of cut-to-length (CTL) harvesting method in a mountainous forest. Small-scale Forestry 12(2): 181–192. https://doi.org/10.1007/s11842-012-9204-4

Guerrieri, M., Fedrizzi, M., Antonucci, F., Pallottino, F., Sperandio, G., Pagano, M., Figorilli, S., Menesatti, P., Costa, C., 2016: An innovative multivariate tool for fuel consumption and costs estimation of agricultural operations. Span. J. Agric. Res. 14(4): 4. https://doi.org/10.5424/sjar/2016144-9490

Gupta, N., 2013: Artificial neural network. Netw Complex Syst 3(1): 24–28.

Harrop Galvao, R.K., Ugulino Araujo, M.C., Emıdio Jose, G., Coelho Pontes, M.J., Cirino Silva, E., Bezerra Saldanha, T.C., 2005: A method for calibration and validation subset partitioning. Talanta 67: 736–740. https://doi.org/10.1016/j.talanta.2005.03.025

Harstela, P., 1988: Principle of comparative time studies in mechanized forest work. Scandinavian J. For. Res. 3(1–4): 253–257. https://doi.org/10.1080/02827588809382513

Hassoun, M.H., 1995: Fundamentals of artificial neural networks. MIT press, 511 p.

Haykin, S.S., 2009: Neural networks and learning machines (Vol. 3). Upper Saddle River: Pearson, 26 p.

Kanawaty, G., 1992: Introduction to work study. International Labour Office, Geneva, 467 p.

Maesano, M., Picchio, R., Monaco, A., Neri, F., Lasserre, B., Marchetti, M., 2013: Productivity and energy consumption in logging operation in a Cameroonian tropical forest. Ecol. Eng. 57: 149–153. https://doi.org/10.1016/j.ecoleng.2013.04.013

Magagnotti, N., Spinelli, R., 2011: Financial and energy cost of low-impact wood extraction in environmentally sensitive areas. Ecol. Eng. 37(4): 601–606. https://doi.org/10.1016/j.ecoleng.2010.12.021

Mederski, S.P., Venanzi, R., Bembenek, M., Karaszewski, Z., Rosińska, M., Pilarek, Z., Luchenti, I., Surus, M., 2018: Designing Thinning Operations in 2nd Age Class Pine Stands – Economic and Environmental Implications. Forests 9(6): 335. https://doi.org/10.3390/f9060335

Miyata, E.S., 1980: Determining fixed and operating costs of logging equipment. General Technical Report NC-55. St. Paul, MN: Dept. of Agriculture, Forest Service, North Central Forest Experiment Station, MN, USA, 20 p.

Mossalam, A., Arafa, M., 2017: Using artificial neural networks (ANN) in projects monitoring dashboards’ formulation. HBRC journal 14(3): 385–392. https://doi.org/10.1016/j.hbrcj.2017.11.002

Mundel, M., Danner, D., 1994: Motion and Time Study: improving productivity. Prentice Hall, Englewood Cliffs, NJ, USA, 770 p.

Musat, E.C., Apăfăian, A.I., Ignea, G., Ciobanu, V.D., Iordache, E., Derczeni, R.A., Sparchez, G., Vasilescu, M.M., Borz, S.A., 2016: Time expenditure in computer aided time studies implemented for highly mechanized forest equipment. Ann. For. Res. 59(1): 129–143. https://doi.org/10.15287/afr.2015.473

Nabavi-Pelesaraei, A., Rafiee, S., Mohtasebi, S.S., Hosseinzadeh-Bandbafha, H., Chau, K.W., 2018: Integration of artificial intelligence methods and life cycle assessment to predict energy output and environmental impacts of paddy production. Science of the Total Environment 631: 1279–1294. https://doi.org/10.1016/j.scitotenv.2018.03.088

Naghdi, R., Ghajar, I., Tsioras, P.A., 2016: Time prediction models of grapple skidder HSM 904 using multiple linear regressions (MLR) and adaptive neuro-fuzzy inference system (ANFIS). Oper. Res. Int. J. 16(3): 501–512. https://doi.org/10.1007/s12351-015-0210-0

Olsen, E.D., Kellogg, L.L., 1983: Comparison of time study techniques for evaluating logging production. Trans. ASAE 26: 1665–1668. https://doi.org/10.13031/2013.33821

Picchio, R., Sirna, A., Sperandio, G., Spina, R., Verani, S., 2012: Mechanized harvesting of eucalypt coppice for biomass production using high mechanization level. Croat. J. For. Eng. 33(1): 15–24.

Picchio, R., Maesano M., Savelli, S., Marchi, E., 2009: Productivity and energy balance in conversion of a Quercus cerris L. coppice stand into high forest in Central Italy. Croat. J. For. Eng. 30(1): 15–26.

Proto, A.R., Skoupy, A., Macrì, G., Zimbalatti, G., 2016: Time consumption and productivity of a medium size mobile tower yarder in downhill and uphill configurations: a case study in Czech Republic. J. Agric. Eng. 47(4): 217–221. https://doi.org/10.4081/jae.2016.551

Proto, A.R., Zimbalatti, G., 2016: Firewood cable extraction in the southern Mediterranean area of Italy. For. Sc. Technol. 12(1): 16–23. https://doi.org/10.1080/21580103.2015.1018961

Proto, A.R., Macrì, G., Visser, R., Russo, D., Zimbalatti, G., 2018: Comparison of timber extraction productivity between winch and grapple skidding: A case study in southern Italian forests. Forests 9(2): 61. https://doi.org/10.3390/f9020061

Proto, A.R., Bacenetti, J., Macrì, G., Zimbalatti, G., 2017: Roundwood and bioenergy production from forestry: Environmental impact assessment considering different logging systems. J. Clean. Prod. 165: 1485–1498. https://doi.org/10.1016/j.jclepro.2017.07.227

Reis, L.P., de Souza, A.L., dos Reis, P.C.M., Mazzei, L., Soares, C.P.B., Torres, C.M.M.E., da Silva L.F., Ruschel A.R., Sousa Rego, L.J, Leite, H.G., 2018: Estimation of mortality and survival of individual trees after harvesting wood using artificial neural networks in the amazon rain forest. Ecological Engineering 112: 140–147. https://doi.org/10.1016/j.ecoleng.2017.12.014

Sanquetta, C.R., Piva, L.R., Wojciechowski, J., Corte, A.P., Schikowski, A.B., 2018: Volume estimation of Cryptomeria japonica logs in southern Brazil using artificial intelligence models. Southern Forests: a Journal of Forest Science 80(1): 29–36. https://doi.org/10.2989/20702620.2016.1263013

Spinelli, R., Laina-Relańo, R., Magagnotti, N., Tolosana, E., 2013: Determining observer and method effects on the accuracy of elemental time studies in forest operations. Baltic Forestry 19(2): 301–306.

Spinelli, R., Magagnotti, N., 2011: The effects of introducing modern technology on the financial, labour and energy performance of forest operations in the Italian Alps. For. Pol. Econ. 13(7): 520–524. https://doi.org/10.1016/j.forpol.2011.06.009

Spinelli, R., Magagnotti, N., Schweier, J., 2017: Trends and perspectives in coppice harvesting. Croat. J. For. Eng. 38(2): 219–230.

Steinlin, H., 1955: Zur Methodik von Feldversuchen im Hauungsbetrieb. Mitt Schweiz Anst Forstl VerWes 31: 249–320.

Tam, V.W., Senaratne, S., Le, K.N., Shen, L.Y., Perica, J., Illankoon, I.C.S., 2017: Life-cycle cost analysis of green-building implementation using timber applications. J. Clean. Prod. 147: 458–469. https://doi.org/10.1016/j.jclepro.2017.01.128

UK Forestry Commission, 1995: Terrain classification. Tech Note 16(95): 5.

Vieira, G.C., de Mendonça, A.R., da Silva, G.F., Zanetti, S.S., da Silva, M.M., dos Santos, A.R., 2018: Prognoses of diameter and height of trees of eucalyptus using artificial intelligence. Science of The Total Environment 619: 1473–1481. https://doi.org/10.1016/j.scitotenv.2017.11.138

Zimbalatti, G., Proto, A.R., 2009: Cable logging opportunities for firewood in Calabrian forests. Biosys Eng 102(1): 63–68. https://doi.org/ 10.1016/j.biosystemseng.2008.10.008

© 2018 by the authors. Submitted for possible open access publication under the
terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).

Authors’ addresses:

Andrea Rosario Proto

e-mail: andrea.proto@unirc.it

Giorgio Macrì

e-mail: giorgio.macri@unirc.it

Giuseppe Zimbalatti

e-mail: gzimbalatti@unirc.it

Mediterranean University of Reggio Calabria

Department of AGRARIA

Feo di Vito

89122 Reggio Calabria (RC)

ITALY

Giulio Sperandio

e-mail: giulio.sperandio@crea.gov.it

Corrado Costa *

e-mail: corrado.costa@crea.gov.it

Francesca Antonucci

e-mail: francesca.antonucci@gov.it

Consiglio per la ricerca in agricoltura e l’analisi dell’economia agraria (CREA)

Centro di ricerca Ingegneria e Trasformazioni agroalimentari

Via della Pascolare 16

00015 Monterotondo (Rome)

ITALY

Mauro Maesano

e-mail: mauromaesano@gmail.com

National Research Council of Italy

Institute for Agricultural and Forest Systems in the Mediterranean

and

University of Tuscia

Department of Innovation in Biological, Agro-food and Forest Systems

Via San Camillo De Lellis

01100 Viterbo

ITALY

Giuseppe Scarascia Mugnozza

e-mail: gscaras@unitus.it

University of Tuscia

Department of Innovation in Biological, Agro-food and Forest Systems

Via San Camillo De Lellis

01100 Viterbo

ITALY

* Corresponding author

Received: December 11, 2018

Accepted: July 1, 2019

Original scientific paper

Publishers:
Copublishers:

Web of Science Impact factor (2022): 3.200
Five-years impact factor: 3.000

Quartile: Q1 - Forestry

Subject area

Agricultural and Biological Sciences

Category/Quartile

Forestry/Q1